marina-tower-rfp.pdf
Sample Costing File-R1.xlsx
Capture the tender
Uploads are stored intact and downloadable. The extracted register never replaces the source document.
A hand-built mock in the site theme, modelled on the real screen and populated with our demo tenant's data — not a screenshot. Hover to pause.
More in Capture the tender
Upload the RFP and EstiWright pins the tender number, page count and source file before anything else happens.
| Ref | Discipline | Text | Page |
|---|---|---|---|
| 3.1 | mechanical | HVAC for all occupied floors per ASHRAE 62.1. | 3 |
| 4.2 | electrical | LV distribution with N+1 redundancy on risers. | 4 |
| 5.4 | elv | Structured cabling Cat6A to every workstation. | 5 |
One pass over the tender produces a structured register — reference, discipline, mandatory flag and source page.
Every requirement carries an explicit mandatory flag, so nothing binding is left to memory.
We'll run your RFP through the same pipeline and show you the output.