| Element | Sys | Qty | List price |
|---|---|---|---|
| Fibre patch panel 24F | SCS | 18 | 640.00 |
| PoE injector 90W | CCTV | 40 | 310.00 |
Take off & price
Add what the workbook missed
Manual material lines sit alongside imported ones, so a late scope addition never lives in someone's inbox.
A hand-built mock in the site theme, modelled on the real screen and populated with our demo tenant's data — not a screenshot. Hover to pause.
More in Take off & price
Keep going
| Element | Scope | Qty | Unit | Location |
|---|---|---|---|---|
| IP dome camera | CCTV | 180 | EA | L1–L42 |
| Cat6A outlet | SCS | 1,240 | EA | Typical floor |
| Access door controller | ACS | 96 | EA | Core lobbies |
Quantity take-off
Quantities land against element, scope, unit and location — the spine every price hangs from.
| Element | Sys | Qty | List price | Disc % | Margin % |
|---|---|---|---|---|---|
| IP dome camera | CCTV | 180 | 220.00 | 18 | 22 |
| Cat6A outlet | SCS | 1,240 | 38.00 | 12 | 24 |
| Door controller | ACS | 96 | 910.00 | 15 | 20 |
Price the bill of quantities
List price, discount, freight and margin per line — every column that moves the number is visible and editable.
25%markup
20%margin
$1,250,000on $1.00m cost
Markup is not margin
The two diverge fast, and the gap is where bids are quietly lost. Watch a 25% markup land as a 20% margin.
See this on your own tender.
We'll run your RFP through the same pipeline and show you the output.